|
|
|
last fitting of the solar lanterns
|
|
|
|
work-bench
|
|
|
|
work-bench in Kondoa, Tanzania
|
|
|
|
solar lanterns in a hut
|
|
|
|
|
3-stones-stove with petrol oil
|
|
|
|
workshops in Mpwapwa, Tansania
|
|
|
|
dangerous conditions for the installation of the “solar-home-system”.
|
|
|
|
the fitting of the cables to the roof an a very dangerous ladder
|
|
|
|
|
one of the the three large moduls is fitted on the roof ot the new solar-workshop
|
|
|
|
the delievering of the installation inside with charge control, solar battery and a charge station for the solar lanterns
|
|
|
|
the new solar workshop in Mpwapwa with "solar-home-system" on the roof is now ready
|
|
|
|
children are fetching the solar lanterns with the charged batteries
|
|
|
|
|
this young man fetches the solar lanterns by bicycle
|
|
|
|
the new guesthouse gets the electric energy from the "solar-home-system" too.
|
|
|